No waterway infrastructure in our state or the surrounding area was designed for 8+ inches of water in such a short period of time.
Creeks, culverts, road drainage and angles for runoff - all the upstream started to build and fail first, even as the downstream events slowly built up.
Roads were cut off. Hill sides and forests were unable to divert the water.
It all had to go somewhere.